Showing posts with label yachtclub. Show all posts
Showing posts with label yachtclub. Show all posts

Tuesday, August 03, 2010

Things I've done lately that made me feel productive in a knitterly way

  1. Sent off a pattern proposal

    My fingers are crossed really hard.

  2. Worked on socks for my brother

    In progress, 2010-08-03

    They're hat-heels, only this time, I think I have finally perfected the way to do the gussets so that a) they're stretchy; b) there are almost no stitches to pick up for foot and leg; c) the whole starting-the-foot-and-leg process is way less fiddly; and d) the gusset edges look tidy when the sock is all done.

    I'll be providing a write-up of the new process at some point.

  3. Worked on test-knitting the Yacht Club Skirt

    In progress, 2010-08-03

  4. Worked on my brother's Christmas gift blanket

    In progress, 2010-08-03

    Four blocks completed there, and working on the fifth.

    Recently I had the brilliant idea that, since the whole thing was garter stitch, everybody in the family could get in on the action - husband, older daughter, even my younger daughter if I held her hands through a few stitches. And then not only would the whole thing go faster (since it wouldn't just be me working on it), but it could be a gift from the whole family, and then I could give him the socks (mentioned above) which would be just from me. And suddenly we would have most of my brother's gift-giving all taken care of. (He's challenging to buy for.)

    Alas, my older daughter shot this idea down completely. When I floated the idea of her doing some of the knitting on the blanket, she was absolutely adamant that she didn't want to. Which, now that I think about it, is odd. She's an extremely enthusiastic and considering sort of person; it's very unusual for me to get a point-blank refusal with an accompanying distasteful expression right off the bat. So she must really not want to do it. Rats.

  5. Thought about the rest of the Christmas knitting
    • I'm thinking a Kilkenny sweater for BIL#2, from the yarn I got last Christmas from BIL#1. (Don't think that's a big dis of BIL#1, though - he told me when I unwrapped it that I wasn't allowed to use it for a sweater for him.)
    • Inside-out socks for BIL#1, using some self-striping sock yarn I've got in a blue/green/white colourway, and maybe a second pair out of a cream/khaki sock yarn I also have kicking around in the stash
    • Socks for DD1, from a turquoise self-striping yarn in the stash
    • Socks for DD2, from the same turquoise self-striping yarn
    • Socks for my dad - maybe some more nice black dress ones; or maybe I'll do a fun extra fair isle pattern on the gussets using dark green. He appreciates artistic details like that. Hm...
    • Something (don't know what) for whomever DD1's teacher will be
    • Finally finish the two pairs of cotton socks I've had going for my mom for ages
    Erg. It's not even September and I'm already feeling the stress just thinking of all of that. Good thing I'm treating myself to a week-long staycation in October.

Sunday, July 25, 2010

Laughing in the face of deadlines

Sometimes I can be pretty stupid with the knitting.

First of all, I'm trying to finish up samples for a design proposal. The proposal has to be done in a few weeks, but the samples are going to be a gift for a very pregnant co-worker whose group goodbye-and-present-giving is probably going to be in just a few days, so I really have to hustle. (As I'm submitting it to a magazine, I can't show it to you, obviously. But I love it, think it is super-cute, and have gotten fantastic squeak reactions from my co-workers who are in on the surprise.)

Secondly, we have this:

In progress, 2010-07-25

Why, you may be wondering, is she showing us the same blanket-for-her-brother's-Christmas-present that we saw last week? Aha! It is not the same blanket-for-my-brother's-Christmas-present that I showed you last week, i.e. this:

In progress, 2010-07-21

Yes, I know, they look exactly the same. However, the second picture is the one I started last weekend, and the first picture is of the new one that I started on Friday. It uses smaller needles, I didn't double up the fuzzy cream yarn this time, and as a result of both of these changes, I like it a lot better. I don't know if it's going to end up being big enough, but I can probably add a few more colour blocks at the side and top if needed. But yeah, massive Christmas project and I ditched an entire weekend's worth of knitting to start it all over again. Smart.

But wait! There's more!

I found this pattern by "Anadiomena" (MoreKnits). She does great baby and kid stuff, I'd already had her favourited as a designer on Ravelry long before I found that fantastic little skirt. Anyway, I emailed her to ask if she could put me on her mailing list to be notified once the pattern became available, and next thing I knew, she was asking me if I wanted to test knit it, and she really needed someone to do the 6-8 year size, and my older daughter is 7 years old, and I'd have about 4-6 weeks to finish it, and...and...

In progress, 2010-07-25

Yeah.

Like I said, pretty stupid with the knitting.