Showing posts with label challahcover2. Show all posts
Showing posts with label challahcover2. Show all posts

Thursday, October 25, 2012

Back to business

Okay, so now that the birthday celebrations and urge to explain one more thing about double knitting are out of the way, I'm going to return to the usual (and hopefully not desperately boring) routine of describing my knitting progress.

Short version: It's been all deadline knitting all the time over here.

Firstly, the challah cover for my friend's 10-year wedding anniversary was finished in time with not too much stress. I waffled a bit on what I would use for the embroidered (duplicate stitch) words, but eventually went with my first instinct (doubling up the project yarn), and I was absolutely thrilled with the result:

Completed, better light

And she certainly seems to love it. :) So, yay!

So with that done, it was back to the holiday knitting.

The bad news right up front: I've made no further progress on my dad's hat, my mom's socks, my brother's hat, my husband's sweater, or my toddler's cardigan. In fact, I rather fear I've gone backwards on my brother's hat, since I tried opening up the spreadsheet with the charts on it this morning and got an error, so the charts may be gone and I might have to recreate the pattern all over again, which would suck monkey balls.

However, there is good news:

  • Socks for BIL2: First sock done, second sock started!


    In progress, 2012-10-25


  • Mittens for our daycare provider: Charted and begun. Unfortunately, I discovered after I'd started decreasing for the top of the first mitten that it was coming out way too short. (I'm going to chalk that up to my swatch having lied to me.) So last night I re-charted, and this morning I ripped the mitten back to the top of the ribbing and re-started. I will say, though, that I am giddy with how beautifully the motifs came out, and am therefore ridiculously excited about this design. I have no idea where I'm going to submit this, but I'm confident that even if it gets rejected initially, surely someone somewhere will eventually take it, and I can't wait to share!


  • Mittens for DD2's teacher: Done! I'm very happy with how they turned out. And moreover, I wrote up a design proposal for the pattern and sent it off. This is my first physical (non-emailed) submission ever, so it was quite a relief to get an email at the beginning of the week that it had successfully arrived before the deadline.


  • Fingerless mitts for DD1's ballet teacher: Done! I did indeed replace the bass and treble clefs with ballet-related motifs, and I'm super-pleased at how they turned out:


    palms

    Completed, palms


    backs

    Completed, back of hands


  • NEW - Lace bolero for niece: I guess I was feeling giddy from all the project finishing...or maybe it was the yarn fumes...but I decided I was doing so well that I could add another project. (Famous last words, I know.) I was also looking for an excuse to use some sock yarn I bought on sale at Lettuce Knit a few weeks ago. So I decided that my niece might like a bolero-type cardigan, did a Ravelry search for likely patterns, and settled on Shetland Shorty, from Knitty.


    It's turning out to be really quite perfect, and the pattern is easy to resize in order to a) fit my niece and b) make sure I don't run out of yarn (I have only about 85% of the yardage that the pattern requires). I'm following the XS size instructions because they're supposed to result in a 25.5" circumference, which should fit her okay now and give her room to grow, too. It's the length I really need to adjust, because the given 13.5" is more likely to result in a full-length cardigan than a bolero! However, all I have to do is decrease the number of pattern repeats up the front and the back. The pattern says to do 17, but I'm going to shave that down to about 13 - maybe even fewer. I'll hold it up to DD1 as I go, to make sure. She's slightly younger than my niece, and probably a fair bit shorter, but even so, I think she's still a pretty accurate measuring stick for torso length.


    At any rate, it looks great so far:


    In progress, 2012-10-25

Wednesday, October 10, 2012

Gifts a-plenty

So I've revised my holiday knitted gifts list down to a more reasonable level (I think), and started working on it in earnest. (Family members, LOOK AWAY NOW PLEASE!)

  1. Morgan hat for Dad

    When last we left this, I had realised it came out much too small to fit my dad, and that I would have to frog it all and restart. I still have to do this.


  2. Two pairs of socks for Mom

    One pair, as I've already mentioned, is done. And I've started the other one:


    In progress, 2012-10-10


    Although if I get crunched for time, I'll drop the idea of making a second pair.


  3. Hat for my brother

    This is a complete non-surprise for him, because he has a very specific kind of hat in mind that he wants me to knock off, and we've been discussing the details extensively. I haven't started it, but I have charted the essential pattern and found the yarn for it, which is an excellent start. Next task: find out his head circumference.


  4. Durrow sweater for DH

    Haven't touched this in a while. Still hoping I won't run out of yarn on the sleeves.


  5. Secret Garden cardigan for DD3

    When last we left this, I was totally stalling on continuing because I was convinced I was going to run out of yarn before finishing the collar and button bands. That's still where I am, but I am at least resolved to buy some more yarn (different yarn, same colour, which should be fine since it's probably just the button bands I'd need to use it for) if I do indeed run out, rather than ripping the whole thing back and starting again.


  6. Socks for BIL#1

    Done!


    bil1socks-completed


  7. Socks for BIL#2

    Started!


    In progress, 2012-10-10


  8. Mittens for our daycare provider

    The nice thing about this gift is that I can give it to her as a New Year's present, as she doesn't celebrate Christmas. One extra week to work on it, ha ha! But I have found some spectacular motif inspiration for this, and am really looking forward to designing it. The trick will be to resist doing that until I've made better headway on the projects which all have an earlier deadline.


  9. Cowl for DD1's teacher

    Done! No pictures though, sorry. I'm hoping a magazine will like the design.


  10. Mittens for DD2's teacher

    Yarn has been purchased, motifs have been decided upon, and right now I'm just figuring out gauge. I originally started with 4mm needles but I have a bad feeling that's going to make pretty breezy mittens, so I'm going to try seeing what gauge I get with 3.5mms instad.


  11. Fingerless mitts for DD1's dance teacher

    Anne Neumann's Musica pattern has been in my queue for ages, and I thought it would work really nicely for this purpose. DD1 concurs, although she's asked if maybe I could replace the bass and treble clefs with pointe shoes, or some other ballet-related motif? So I'm going to try.

You'll notice I've dropped the projects for DD1 and DD2 - that's in the interest of my own sanity. I make them stuff throughout the year, so this is not a tragedy. And hey, if I finish everything with time to spare, I'll cast on for them. Although admittedly, if I have time to spare, I'm much more likely to cast on something for my niece instead.

I also picked up a new piece of gift knitting that needs to be finished for this weekend, which is the grand 10th anniversary celebration of one of my bestest friends. :) It's a challah cover:

In progress, 2012-10-10

It may look like I'm doing well there, but even after that lace edging gets finished, it has to be sewn to the main section; then there's a cable to be knitted that has to be sewn over the edging seam; and then there's embroidery. Things could get tight.